References

We are proud that we have been fully satisfying our customers for over 15 years.

HVAC projects and industrial references

All
Complete planning and implementation of air conditioning in a part of Tredegar hall

Complete planning and implementation of air conditioning in a part of Tredegar hall

Air drying in technological area at Nissin

Air drying in technological area at Nissin

Ventilation system mechanical and automation installations – Bridgestone production hall

Ventilation system mechanical and automation installations – Bridgestone production hall

Production line ‘zone’ cooling with textile air duct

Production line ‘zone’ cooling with textile air duct

Comfort HVAC implementation – Bridgestone factory

Comfort HVAC implementation – Bridgestone factory

Comfort HVAC implementation – NHK production hall

Comfort HVAC implementation – NHK production hall

Control room air conditioning – Dunafin

Control room air conditioning – Dunafin

All
Székesfehérvár plant heat-treatment furnace

Székesfehérvár plant heat-treatment furnace

Dunavarsány plant fume wash

Dunavarsány plant fume wash

Bridgestone heptane exhaust

Bridgestone heptane exhaust

Denso furnace hheat exhaust

Denso furnace hheat exhaust

Essentra carbon dust exhaust

Essentra carbon dust exhaust

Dunavarsány plant silicone carbide exhaust

Dunavarsány plant silicone carbide exhaust

References in industrial technology

All
Extension of technological cooling system – EKK production line

Extension of technological cooling system – EKK production line

Mechanical engineering Implementation of technological cooling, compressed air, and gas system – NHK

Mechanical engineering Implementation of technological cooling, compressed air, and gas system – NHK

Electric connection of Samsung liquid coolers

Electric connection of Samsung liquid coolers

Planning, authorisation, and implementation of dust exhaust system– Essentra cigarette filter factory

Planning, authorisation, and implementation of dust exhaust system– Essentra cigarette filter factory

Exhaust system of battery-charger– factory in Szigetszentmiklós

Exhaust system of battery-charger– factory in Szigetszentmiklós

Dust exhaust – Particulate Filter Plant, Dunavarsány

Dust exhaust – Particulate Filter Plant, Dunavarsány

All
Planning and installation of complete building engineering in a hatcher building in Hortobágy

Planning and installation of complete building engineering in a hatcher building in Hortobágy

High-current and automation system installation in a compressor house in a factory in Székesfehérvár

High-current and automation system installation in a compressor house in a factory in Székesfehérvár

HVAC automation system implementation in a factory in Dunavarsány

HVAC automation system implementation in a factory in Dunavarsány

Power cables in a factory in Dunavarsány

Power cables in a factory in Dunavarsány

Low- and medium voltage electrical planning and installation of production lines in Ibiden

Low- and medium voltage electrical planning and installation of production lines in Ibiden

Complete building service automation system, spring factory, NHK

Complete building service automation system, spring factory, NHK

All
Complete construction of our plant in Nagytarcsa

Complete construction of our plant in Nagytarcsa

Tank foundation with emergency collector

Tank foundation with emergency collector

Construction of assembly plant in Székesfehérvár

Construction of assembly plant in Székesfehérvár

Industrial floor reinforcement

Industrial floor reinforcement

Manufacture of steel platform

Manufacture of steel platform

Design and manufacture Tredegar rooftop steel structure

Design and manufacture Tredegar rooftop steel structure

Project management and engineering consulting services

Ibden-logo

IBIDEN factories MandD project management, ongoing, since 2005

Bridgestone-logo

Bridgestone tyre factory, phase 2, M & D project management

Danso-logo

DENSO factory M & D project management, ongoing, since 2006

Essentra-logo

Essentra hall air conditioning and technical supervision

Nhk-logo

NHK spring factory – M&E project management

Why DAAL GROUP?

15

years of experience in industrial environment

12

Mechanical and electrical installations/project management in 12 Japanese factories

600000

Mechanical and electrical installation in 600,000+ m2 industrial hall

8

8+ years of experience in design/installation of textile ducts

References